Extension and Dwelling at Freshfields, Five Roads, LLANELLI

Lewis Partnership Architects  on behalf of the client had appointed Vaughan Construction Limited as the Principial Contractor for the Proposed Extension and Dwelling at Freshfields, Five Roads, Llanelli.

The works include the demolition of the existing outbuilding including floors slab and foundations.  Excavate to reduce levels and trenches to receive foundations.  Install Spantherm insulated precast concrete slab system including blockwork substructure.  Installation of structural steelwork.  Installation of timber frame including all necessary insulation.  Install Euroclad standing seam wall cladding and roof.  External timber cladding.  Install uPVC external windows, bifold door and entrance doors.  Carpentry and Joinery works including timber partition stud walls, door sets, architraves and skirting.  Drylining works with plaster skim finish to partitions and ceilings.  1st and 2nd M&E to suit new layout including solar PV array.  Decoration works.  Testing and commissioning.  

Client: Private
Architect: Lewis Partnership Architects
Engineer: MW Consult Ltd
Duration: 32 weeks

New Build at The Old Coach House, Llandarrog, cARMARTHEN

A private client appointed Vaughan Construction Limited as principal contractor for the construction of a new build single storey dwelling and car port.

The works include the excavation to reduce levels in preparation to form concrete foundations.  Install new storm and foul drainage and service connections.  Construction of a traditional blockwork dwelling with external Parex one coat render system.   Installation of structural steelwork.   Form new blockwork internal walls and stud partition walls.  Construct new eco-joist insulated Sika flat roof with flat roof lights.  New anthracite grey aluminium windows and doors with sliding door.  1st and 2nd fix Mechanical installation including air source heat pump, mechanical extraction and heat recovery system, underfloor heating system and controls, sprinkler system and fitting only of client supplied sanitary items.  1st and 2nd fix Electrical installation including metering and distribution boards, power, internal and external lighting, fire and CO detection alarms, telecommunications and Solar PV.  Carpentry & joinery, drylining walls and ceilings with skim finish.  Decoration of all plastered walls and ceilings including timber frames and skirtings.  Testing and commissioning. 

Client: Private
Architect: John Davies Architectural
Duration: 46 weeks

New Build at Pentre Nicklaus, Llanelli

A private client appointed Vaughan Construction Limited as principal contractor for the construction of a new build development at Pentre Nicklaus.

The works include the demolition of the existing external blockwork from the substructure and construct a new traditional building to match the neighbouring properties.

Client: Private
Architect: Lewis Partnership Architects
Duration: 36 weeks

Construction of New Residential Dwelling at Southgate Road, Southgate, Swansea

Works comprised of the substructure works Inc. raft foundation/slab & all drainage connections. Construction of a timber frame dwelling Inc. new slate roof coverings, new Upvc windows, Parex one coat render system with a scratched finish. Internal finishes Inc. new heating system, new electrical installation, sprinkler system, carpentry & joinery, drylining & decoration etc. External finishes Inc. permeable paving, stone paving slabs, timber retaining walls, stone walls & turfing.

Client: Life Property Development Ltd
Architect: Darkin Architects
Engineer: HCE Limited
Duration: 21 weeks

Construction of New Semi-Detached Residential Dwellings at The Bell Inn, Bynea, Llanelli

Works comprised of – Substructure works Inc. Raft foundation/slab & all drainage connections. Construction of a timber frame dwelling Inc. new slate roof coverings, new Upvc windows, Parex one coat render system with a scratched finish. Internal finishes Inc. new heating system, new electrical installation, sprinkler system, carpentry & joinery, drylining & decoration etc. External finishes Inc. permeable paving & paving slabs.

Client: Met-Bar Ltd
Architect: Lewis Partnership
Engineer: MW Consult & CB3
Duration: 24 weeks

CONSTRUCTION OF NEW RESIDENTIAL DWELLING - PENLLWYNGWYN ROAD, BRYN, LLANELLI

Works comprised of – Substructure works Inc. foundation/slab & all drainage connections. Construction of a timber frame dwelling Inc. new slate roof coverings, new Upvc windows, Parex one coat render system with a scratched finish Inc. stone work plinths and feature walls. Internal finishes Inc. new heating system, new electrical installation, sprinkler system, carpentry & joinery, drylining & decoration etc. External finishes Inc. permeable paving, stone paving slabs, timber retaining walls, stone walls & turfing.

Client: Mr & Mrs N Roberts
Architect: Lewis Partnership
Engineer: MW Consult & Roger Casey
Duration: 24 weeks