Current Projects

Refurbishment & Construction of New Co-Op Store & 4no Apartments - Former Reef Bar, 127 Walter Road, Swansea

Works consist of - Construction of rear steel frame double storey extensions Inc. structural slab, beam & block 1st floor construction and a mix between flat and slate roof finishes. Structural repairs to the existing masonry walls Inc. new structural openings. Strip existing roof coverings, Install new attic trussed roof construction & re-cover with new slate roof coverings. Replace existing fascia, soffits & RWG with new Upvc items. Installation of Cedral Click Cladding to part elevations. Internal refurbishment Inc. Installation of structural steels, new heating system, new electrical installation, sprinkler installations, carpentry & joinery, internal finishes etc.

Client: Aspect Development Swansea Ltd
Architect: DR Design Ltd
Engineer: MW Consults
Duration: 24 weeks

Side and Rear Extensions including Internal Refurbishment of Existing Dwelling. - Moorland Road, Port Talbot

Works consist of – Demolition of an existing single storey extension & garage Construction of double storey side extension along with a rear single storey extension. Internal refurbishment Inc. Installation of structural steels, new heating system, new electrical installation, carpentry & joinery, internal finishes etc.

Client: Mr & Mrs J Protheroe
Architect: Creation Design - Wales
Engineer: Keystone Structural Engineering
Duration: 21 weeks

Side Extension including Internal Refurbishment of Existing Dwelling. - Hendre Park, Llangennech

Works consist of – Demolition of an existing side garage. Construction of double storey side extension. Internal refurbishment Inc. Installation of structural steels, new heating system, new electrical installation, carpentry & joinery, internal finishes etc.

Client: Mr G Hill
Architect: Lewis Partnership
Engineer: MW Consult
Duration: 16 weeks

Structural works to an existing Chapel to form a new ground floor commercial space and 4no residential flats to the 1st & 2nd floors. - Zion Chapel, Burry Port

Works consist of – Construction of structural foundations. Installation of structural steel frame and beams. Installation of posi joist structural floors and internal timber frame walls. Forming new openings in the existing stone walls to create new curved head windows. External rendering works.

Client: DD Mechanical
Architect: Lewis Partnership
Engineer: Mel Williams Partnership, Llanelli
Duration: 12 weeks

Construction of New Residential Dwelling. - Penllwyngwyn Road, Bryn, Llanelli

Construction of New Residential Dwelling. - Penllwyngwyn Road, Bryn, Llanelli

Works consist of – Substructure works Inc. foundation/slab & all drainage connections. Construction of a timber frame dwelling Inc. new slate roof coverings, new Upvc windows, Parex one coat render system with a scratched finish Inc. stone work plinths and feature walls. Internal finishes Inc. new heating system, new electrical installation, sprinkler system, carpentry & joinery, drylining & decoration etc. External finishes Inc. permeable paving, stone paving slabs, timber retaining walls, stone walls & turfing.

Client: Mr & Mrs N Roberts
Architect: Lewis Partnership
Engineer: MW Consult & Roger Casey
Duration: 24 weeks

Our Partners:

"Building on Skill & Knowledge"

Our Clients Include:

  • Aspect Developments
  • Bro Myrddin Housing Association
  • Hurley & Davies
  • Life Property Development Ltd.
  • Surfside Properties