Extensions

Rear Extension and Refurbishment of Existing Dwelling. - Penyfai Lane, Llanelli

Works comprised of – Construction of rear single storey extension. Internal refurbishment Inc. Installation of structural steels, new UFH heating system, new electrical installation, carpentry & joinery, internal finishes etc. External works Inc. retaining wall, patio area, finishes to the driveway.

Client: Mr & Mrs R Poolman
Architect: Hugh Griffiths Architects
Engineer: Roger Casey
Duration: 16 weeks

Rear Extension, Attic Conversion and Refurbishment of Existing Dwelling. - Penyfai Lane, Llanelli

Works comprised of – Construction of two number single storey extensions. Attic Conversion Full internal refurbishment Inc. new heating system, new electrical installation, carpentry & joinery, internal finishes etc. Full external refurbishment Inc. replacement of existing roof coverings, replacement of existing fascia’s, soffits & RWG, winey edge external cladding, Upvc windows & doors etc. External works Inc. retaining walls, patio area, tarmacadam to driveway.

Client: Mr & Mrs R Jenkins
Architect: Lewis Partnership, Llanelli
Engineer: Mel Williams Partnership, Llanelli
Duration: 20 weeks

Rear Extension and Refurbishment of Existing Dwelling. - Heol Llanelli, Pontaytes

Works comprised of – Construction of two single and double storey extensions. Internal refurbishment Inc. new UFH heating system, new electrical installation, carpentry & joinery, internal finishes etc. External works Inc. retaining wall, patio area, finishes to the driveway.

Client: Mr & Mrs P Temple
Architect: Darkin Architects
Engineer: HCE
Duration: 16 weeks

Rear Extension and Refurbishment of Existing Dwelling. - Clydach Road, Ynystawe, Swansea

Works comprised of - Construction of rear double storey extension. Strip existing roof coverings & re-cover with new roof coverings. Replace existing fascia, soffits & RWG with new Upvc items. Parex over render system with a scratched finish. Installation of Cedral Click Cladding to Balcony. Internal refurbishment Inc. Installation of structural steels, new UFH heating system, new electrical installation, carpentry & joinery, internal finishes etc.

Client: Mr & Mrs P Patel
Architect: Darkin Architects
Engineer: HCE Limited
Duration: 24 weeks

Construction of a single storey side extension to form a new pantry. - Rehoboth Road, Five Roads

Works comprised of – Construction of a masonry extension with face brick finish with a bespoke timber roof structure Inc. new flat roof covering, new Upvc windows & door Internal finishes Inc., new electrical installation, sprinkler system, carpentry & joinery, drylining & decoration etc.

Client: Mrs B Ward
Architect: G Squared Architecture
Engineer: N/A
Duration: 8 weeks

Side and Rear Extensions including Internal Refurbishment of Existing Dwelling. - Moorland Road, Port Talbot

Works comprised of – Demolition of an existing single storey extension & garage Construction of double storey side extension along with a rear single storey extension. Internal refurbishment Inc. Installation of structural steels, new heating system, new electrical installation, carpentry & joinery, internal finishes etc.

Client: Mr & Mrs J Protheroe
Architect: Creation Design - Wales
Engineer: Keystone Structural Engineering
Duration: 21 weeks

Construction of Sun Room. - Cwmbach Road, Llanelli

Works consisted of – Demolition of the external existing steps and surrounding retaining wall, breaking up the existing path. Construction of a new single storey sunroom extension & store area. The works will include concrete foundations, structural steel framework, external block walls, timber rafters with a fixed clay tile to the roof including fascia and uPVC guttering. New aluminium windows and bi-folding door. Internal partitions, Internal floor, ceiling, and wall finishes. Mechanical and electrical fittings to sunroom and store. External works to allow for new paving, patio area and path edgings. Install new surface water drainage, manhole and Aco drainage to connect to existing systems. Make good and reseed grass areas.

Client: Mr K Lock & Mrs A Nobel
Architect: Lewis Partnership
Engineer: MW Consult
Duration: 16 weeks

Our Partners:

"Building on Skill & Knowledge"

Our Clients Include:

  • Aspect Developments
  • Bro Myrddin Housing Association
  • Hurley & Davies
  • Life Property Development Ltd.
  • Surfside Properties

Our Accreditations:

Copyright © Vaughan Construction Ltd. Company Reg. 10093102
Llanelli Based Construction and Building Services

web design by Web Design Wales